Complete PV Production Lines (100MW–1.2GW)
Complete solar module production line solutions from 100MW to 1.2GW with modular design and high automation. One contract covers line design, equipment supply, installation, commissioning and operator training.
Line capacities
| Capacity | Profile | Floor space | Staff per shift | Automation | Delivery |
|---|---|---|---|---|---|
| 100MW | Compact line for pilot projects and growing manufacturers — modular design, fast deployment, lower initial investment | 3,200 m² | 47 | 78% | 6–8 months |
| 200MW | Mid-size line balancing capacity and investment — cost optimized, flexible configuration, expandable | 5,800 m² | 83 | 82% | 8–10 months |
| 400MW | Large-scale line for mature module factories — high automation, MES integration, quality traceability | 10,500 m² | 152 | 87% | 10–12 months |
| 800MW | High-capacity line for advanced industrial production — smart manufacturing, data driven, end-to-end automation | 19,200 m² | 284 | 91% | 12–15 months |
| 1.2GW | GW-scale line for global competitiveness — Industry 4.0, AI inspection, smart factory | 27,600 m² | 412 | 94% | 15–18 months |
Planning figures for evaluation; final line design is confirmed in the technical quotation against your cell format, module technology and plant conditions.
What a line contract covers
- Comprehensive project management from planning to production
- Equipment integration and optimization across the full machine string
- Installation and commissioning on site
- Operator, maintenance and process training
- Spares package and after-sales technical support
Country-specific planning
We have prepared planning data for lines in Turkey, Egypt, Saudi Arabia, Romania, Serbia and the USA — covering typical site conditions, utility readiness and local content expectations. The right capacity and layout for your site is confirmed during technical evaluation, not assumed. Send your project data and we will evaluate it formally.
Terms: production lines are quoted, contracted and paid by cash or letter of credit in staged milestones. SHARING is the equipment and services supplier — we do not invest in, finance or guarantee your project. Feasibility of your specific project is assessed technically and commercially before any commitment.