Turnkey Lines 200MW

1. Hero

下载是

Turnkey Lines 200MW line layout.

2. Capacity at a Glance

  • 200 MW/year
  • Approx. 2,400-3,000 modules/day
  • Designed for stable production yield up to 99.5% under qualified materials, utilities, and trained operation.

3. Compatible Technologies

  • PERC
  • TOPCon
  • HJT-ready

4. Main Equipment Scope

  • Dual Stringer layout
  • Layup & Bussing
  • Laminator & Framing
  • AOI + EL + packing

5. Utility Requirements

  • Power: 920-1,120 kW connected load
  • Compressed air: 0.6-0.8 MPa
  • Workshop: from 7,500 m2

6. Labor per Shift

  • Operation: 28-36 people/shift
  • Quality + maintenance: 8-10 people/shift

7. Automation & Software

  • Line balancing logic
  • MES interface
  • Yield and downtime dashboard

8. Delivery, Training & Warranty

  • Remote response first, on-site support arranged within 72 hours when remote resolution is not sufficient.
  • Critical spare parts dispatch can be arranged within 48 hours for selected items and regions.