Turnkey Lines 100MW
1. Hero

Turnkey Lines 100MW line layout.
2. Capacity at a Glance
- 100 MW/year
- Approx. 1,200-1,600 modules/day
- Designed for stable production yield up to 99.5% under qualified materials, utilities, and trained operation.
3. Compatible Technologies
- PERC
- TOPCon
- MBB
4. Main Equipment Scope
- Stringer
- Layup & Bussing
- Laminator & Framing
- Testing & Packaging
5. Utility Requirements
- Power: 580-720 kW connected load
- Compressed air: 0.6-0.8 MPa
- Workshop: from 5,500 m2
6. Labor per Shift
- Operation: 22-28 people/shift
- Quality + maintenance: 6-8 people/shift
7. Automation & Software
- SCADA dashboard
- Recipe and traceability management
- SPC-ready data output
8. Delivery, Training & Warranty
- Remote response first, on-site support arranged within 72 hours when remote resolution is not sufficient.
- Critical spare parts dispatch can be arranged within 48 hours for selected items and regions.
