Turnkey Lines 1.2GW

1. Hero

下载是

Turnkey Lines 1.2GW line layout.

2. Capacity at a Glance

  • 1.2 GW/year
  • Approx. 13,000-16,000 modules/day
  • Designed for stable production yield up to 99.5% under qualified materials, utilities, and trained operation.

3. Compatible Technologies

  • TOPCon
  • HJT
  • Future BC adaptation

4. Main Equipment Scope

  • Multi-cluster stringing
  • Layup & Bussing
  • Robotic logistics handoff
  • Intelligent testing + warehouse feed

5. Utility Requirements

  • Power: 5.2-6.5 MW connected load
  • Compressed air: 0.65-0.8 MPa
  • Workshop: from 25,000 m2

6. Labor per Shift

  • Operation: 96-118 people/shift
  • Quality + maintenance: 28-36 people/shift

7. Automation & Software

  • Plant-wide dispatching
  • Data historian integration
  • ERP/MES bi-direction sync

8. Delivery, Training & Warranty

  • Remote response first, on-site support arranged within 72 hours when remote resolution is not sufficient.
  • Critical spare parts dispatch can be arranged within 48 hours for selected items and regions.