Turnkey Lines 400MW

1. Hero

下载是

Turnkey Lines 400MW line layout.

2. Capacity at a Glance

  • 400 MW/year
  • Approx. 4,500-5,500 modules/day
  • Designed for stable production yield up to 99.5% under qualified materials, utilities, and trained operation.

3. Compatible Technologies

  • TOPCon
  • HJT
  • M10/G12 compatibility

4. Main Equipment Scope

  • High-speed Stringer cluster
  • Layup & Bussing
  • Lamination cell
  • Testing & Packaging island

5. Utility Requirements

  • Power: 1.8-2.2 MW connected load
  • Compressed air: 0.6-0.8 MPa
  • Workshop: from 12,000 m2

6. Labor per Shift

  • Operation: 46-58 people/shift
  • Quality + maintenance: 12-16 people/shift

7. Automation & Software

  • End-to-end traceability
  • Recipe lock by product family
  • Industrial software optimization

8. Delivery, Training & Warranty

  • Remote response first, on-site support arranged within 72 hours when remote resolution is not sufficient.
  • Critical spare parts dispatch can be arranged within 48 hours for selected items and regions.