Turnkey Lines 800MW
1. Hero

Turnkey Lines 800MW line layout.
2. Capacity at a Glance
- 800 MW/year
- Approx. 9,000-10,500 modules/day
- Designed for stable production yield up to 99.5% under qualified materials, utilities, and trained operation.
3. Compatible Technologies
- TOPCon
- HJT
- N-type optimized routing
4. Main Equipment Scope
- Parallel Stringer and layup cells
- Layup & Bussing
- High-throughput lamination
- Auto sorting + packaging
5. Utility Requirements
- Power: 3.6-4.4 MW connected load
- Compressed air: 0.65-0.8 MPa
- Workshop: from 18,000 m2
6. Labor per Shift
- Operation: 70-88 people/shift
- Quality + maintenance: 20-26 people/shift
7. Automation & Software
- Cross-line scheduling
- OEE and quality prediction
- Multi-line report center
8. Delivery, Training & Warranty
- Remote response first, on-site support arranged within 72 hours when remote resolution is not sufficient.
- Critical spare parts dispatch can be arranged within 48 hours for selected items and regions.