Turnkey Lines 1.2GW
1. Hero

Turnkey Lines 1.2GW line layout.
2. Capacity at a Glance
- 1.2 GW/year
- Approx. 13,000-16,000 modules/day
- Designed for stable production yield up to 99.5% under qualified materials, utilities, and trained operation.
3. Compatible Technologies
- TOPCon
- HJT
- Future BC adaptation
4. Main Equipment Scope
- Multi-cluster stringing
- Layup & Bussing
- Robotic logistics handoff
- Intelligent testing + warehouse feed
5. Utility Requirements
- Power: 5.2-6.5 MW connected load
- Compressed air: 0.65-0.8 MPa
- Workshop: from 25,000 m2
6. Labor per Shift
- Operation: 96-118 people/shift
- Quality + maintenance: 28-36 people/shift
7. Automation & Software
- Plant-wide dispatching
- Data historian integration
- ERP/MES bi-direction sync
8. Delivery, Training & Warranty
- Remote response first, on-site support arranged within 72 hours when remote resolution is not sufficient.
- Critical spare parts dispatch can be arranged within 48 hours for selected items and regions.